إتصل بنا
Industrial & commercial roof waterproofing specialists

Roof Waterproofing Company in Egypt

Membrane · Polyurea · Spray foam — for factory, warehouse and commercial roofs, executed without shutting you down.

roof waterproofing company Egypt
+200 projects delivered
across Egypt
+200projects delivered
10+years field experience
ISOcertified standards
10Ywarranty up to 10 years
24Hquote within 24 hours

As a specialist roof waterproofing company Egypt operators rely on, we deliver engineered membrane and coating systems for commercial, industrial, and medical facilities across Cairo, 10th of Ramadan, 6th of October, Alexandria, the Delta, and the Canal cities. Our scope covers concrete decks, metal roofs, podium slabs, plant rooms, and utility tanks, addressing thermal shock, UV degradation, ponding, and structural movement typical of Egyptian climates. Every project begins with substrate diagnostics and moisture mapping, followed by system selection matched to substrate condition, service load, and reflectivity targets. We install certified products from Sika, Mapei, Koster, MC-Bauchemie, and BASF Master Builders, backed by documented QA/QC records and post-installation flood testing.

Our engineering team specifies waterproofing systems that meet EN and ASTM standards, ensuring long-term watertightness and thermal performance for logistics warehouses, pharmaceutical plants, hospitals, and food processing facilities. From torch-applied SBS membranes to seamless spray polyurea and heat-reflective acrylic coatings, each system is applied by trained crews with calibrated equipment and third-party verification. As a technically driven roof waterproofing company Egypt developers trust, we integrate insulation, screed-to-falls correction, and detailing at parapets, drains, HVAC curbs, and skylights into a single installation package. Deliverables include as-built drawings, batch traceability, adhesion testing, and a documented flood test report at handover, giving specifiers full compliance evidence.

  • Certified systems from Sika, Mapei, Koster, MC-Bauchemie, BASF
  • Documented flood testing and pull-off adhesion verification
  • Heat-reflective coatings reducing rooftop surface temperatures
  • Full detailing at parapets, drains, HVAC bases, skylights
  • Compliance with EN and ASTM waterproofing standards
Request a Free Roof Survey
roof waterproofing company Egypt
Types & Applications

Which system fits your facility?

01

Torch-Applied Modified Bitumen Membrane

SBS/APP polymer-modified bitumen sheets torch-fused to primed decks at 3 to 5 mm thickness, providing high tensile strength, elastic recovery, and proven performance on large industrial roofs across Cairo and the Delta.

SBS/APP3-5 mmTorch-fusedASTM D6164
02

Spray-Applied Polyurea

Two-component pure polyurea sprayed at high pressure and temperature, curing in seconds to form a seamless, high-elongation membrane ideal for complex geometries, water tanks, and roofs subject to mechanical stress or ponding.

SeamlessFast-cureHigh-elongationSika/MC-Bauchemie
03

Polyurethane Spray Foam Insulation

Closed-cell polyurethane foam sprayed at 40 to 45 kg/m3 density, delivering combined thermal insulation and waterproofing on metal and concrete decks, reducing HVAC loads across warehouses in 6th of October and 10th of Ramadan.

Closed-cell40-45 kg/m3Thermal + WPSeamless
04

Single-Component Liquid-Applied Polyurethane

Cold-applied moisture-curing polyurethane coating forming a monolithic, UV-stable membrane over complex details, suitable for pedestrian-trafficked roofs, plant rooms, and refurbishment projects requiring minimal disruption to ongoing operations.

Cold-appliedMonolithicUV-stableMapei/Sika
05

Heat-Reflective Acrylic Coatings

Elastomeric acrylic coatings with high solar reflectance and emittance values per ASTM C1549, lowering rooftop surface temperatures on commercial buildings in Alexandria and Canal cities while providing secondary waterproofing protection.

ASTM D6083High SRIElastomericCool roof
06

Flexible Cementitious Systems

Two-component polymer-modified cementitious slurries for concrete decks, water tanks, and podium slabs, offering excellent adhesion, crack-bridging capability, and potable water compatibility using Koster and BASF Master Builders formulations.

Polymer-modifiedCrack-bridgingTank-safeKoster/BASF
Sectors Served

Every commercial and industrial sector

Logistics and Distribution Warehouses

Pharmaceutical Manufacturing Plants

Hospitals and Medical Facilities

Food and Beverage Processing Plants

Commercial Office Towers

Shopping Malls and Retail Centers

Industrial Cold Storage Facilities

Water Treatment and Utility Tanks

Technical Specifications

Performance by the documented numbers

MetricTest StandardResult
Membrane ThicknessASTM D61643 to 5 mm
Spray Foam DensityASTM D162240 to 45 kg/m3
Surface Temperature ResistanceEN 1110Above 120 C
Acrylic Coating PerformanceASTM D6083Pass
Pull-Off AdhesionASTM D7234>1.5 MPa
Solar ReflectanceASTM C1549≥0.80
Substrate Moisture ContentASTM D4263<4%
Execution Protocol

Our 8-step execution protocol

01

Roof Survey and Leak-Source Identification

Site walkover, infrared moisture scans, and core sampling to locate active leaks, saturated insulation, and failed laps.

02

Detail Inspection of Vulnerable Points

Systematic assessment of cracks, movement joints, drains, HVAC bases, parapets, and skylights to define the detailing scope.

03

Stripping and Deck Preparation

Removal of failed waterproofing layers, mechanical cleaning, and shot-blasting to expose sound substrate ready for treatment.

04

Crack Treatment and Corner Reinforcement

Routing and filling of cracks with polyurethane sealant and installation of fiberglass or polyester reinforcement at all internal corners.

05

Screed-to-Falls Correction

Application of lightweight polymer-modified screed to eliminate ponding zones and ensure minimum 1:80 fall toward drains.

06

Primer Application

Substrate-specific bituminous, epoxy, or polyurethane primer applied at manufacturer-specified coverage after ASTM D4263 moisture verification.

07

Waterproofing System Installation

Application of the selected membrane or coating at specified thickness under continuous QA/QC monitoring and wet-film gauge checks.

08

Flood Testing and Handover

48-hour flood test with monitored water level, followed by drainage, final inspection, and issuance of the handover report.

Why clients choose us

Manufacturer-Certified Applicators

Our crews hold current certifications from Sika, Mapei, Koster, MC-Bauchemie, and BASF Master Builders. This ensures warranties remain valid and installation follows verified technical data sheets.

Full QA/QC Documentation

Every project includes batch traceability, wet-film thickness logs, pull-off adhesion tests, and flood test reports. Specifiers receive a complete compliance dossier at handover.

Climate-Matched System Design

We specify systems engineered for Egyptian UV load, thermal cycling, and humidity in coastal Alexandria and Canal environments. Material selection reflects real operating conditions, not generic assumptions.

Integrated Insulation and Waterproofing

Our polyurethane spray foam and inverted roof systems combine thermal and moisture control in one package. This reduces HVAC load while eliminating vapor-drive delamination risks.

Nationwide Project Coverage

We mobilize crews and equipment across Cairo, 10th of Ramadan, 6th of October, Alexandria, the Delta, and Canal cities. Regional depots ensure rapid response for large industrial roofs.

Engineering-Led Diagnostics

Every scope begins with infrared surveys, core sampling, and substrate moisture testing before system selection. This eliminates guesswork and prevents recurring failures on refurbishment projects.

FAQ

Frequently asked questions

Which waterproofing system is best for large industrial roofs in Egypt?
For large warehouse and factory roofs across 10th of Ramadan and 6th of October, we typically recommend torch-applied SBS modified bitumen membranes or spray polyurethane foam with a UV topcoat. Selection depends on substrate, thermal requirements, and traffic. Our engineers issue a system recommendation after the initial roof survey.
How long does the roof waterproofing installation take?
Installation duration depends on roof area, existing condition, and system selected. A 5,000 m2 industrial roof with stripping, screed correction, and torch-applied membrane typically requires three to five weeks. Spray polyurea systems accelerate delivery significantly due to their fast-cure characteristics and continuous application.
Do you provide warranties on completed waterproofing works?
Yes. As an established roof waterproofing company Egypt specifiers rely on, we issue combined manufacturer and applicator warranties covering material performance and workmanship. Warranty periods vary by system, ranging from 10 to 20 years, with documented flood testing and adhesion verification supporting each certificate issued.
Can you install waterproofing while facilities remain operational?
Yes. For hospitals, pharmaceutical plants, and food facilities we phase works to maintain operations, using cold-applied liquid polyurethane or acrylic systems that avoid open flames and reduce odor. Night shifts, isolated bays, and dust-controlled setups are standard for sensitive medical and cleanroom environments.
How do you address ponding water on flat concrete roofs?
Ponding is corrected by installing a lightweight polymer-modified screed-to-falls layer achieving minimum 1:80 gradient toward drains. Existing outlets are enlarged or relocated when required. Only after ponding elimination and 48-hour drainage verification do we proceed with primer and waterproofing membrane installation.
What testing confirms the waterproofing installation is successful?
We conduct ASTM D7234 pull-off adhesion tests on coating systems, wet-film thickness checks during application, and a 48-hour flood test at completion. For polyurea and liquid systems, electronic spark testing detects pinholes. All test results are documented in the handover report issued to the client.
Do you handle both new construction and refurbishment projects?
Yes. As a roof waterproofing company Egypt developers and facility managers engage, we deliver new-build waterproofing packages coordinated with structural and MEP trades, plus refurbishment scopes including diagnostics, stripping, and re-waterproofing. Refurbishment projects always begin with core sampling and infrared moisture surveys before scope finalization.

Stop the Leak Before It Costs You Downtime

Request a free roof survey from our technical team — we identify the leak source and specify the right system for your building within 24 hours.

تواصل معنا الآن